Image is for reference only, the actual product serves as the standard.
MAX690AMJASupervisor Push-Pull, Totem Pole 1 Channel 8-CERDIP

N/A

Orders Over $2000 Receive a $100 Discount for Registered Abrmicro Users.
ABRmicro #.ABR2025-MAX690-65135
ManufacturerMaxim Integrated
MPN #.MAX690AMJA
Estimated Lead Time-
SampleGet Free Sample
For large-volume purchases, our unique channels enable us to provide prices that other suppliers cannot match: significantly below market rates.
Service
Guaranteed Authenticity
Technical Support
Fast Refund
Free Shipping (over $960)
Issue an Invoice
24/7 Manual Service
In Stock: 43
Shipped From Shenzhen or Hong Kong Warehouses
Min.&Mult.1
Packaging
Tube
Shipping DateNovember 3, 2024
* Quantity
Send Inquiry
Add To RFQ List
Related Parts
Supervisor Open Drain or Open Collector 4 Channel SOT-23-8
Supervisor Open Drain, Push-Pull 1 Channel SOT-6
LED Driver IC 1 Output DC DC Controller SEPIC, Step-Down (Buck), Step-Up (Boost) PWM Dimming 28-TQFN (5x5)
Battery Fuel Gauge IC Lithium Ion 8-TDFN-EP (2x2)
Linear Voltage Regulator IC Positive Fixed 1 Output 300mA 6-TDFN (3x3)
Buck Switching Regulator IC Positive Adjustable 1V 4 Output 3A 28-WFQFN Exposed Pad
Low-Side Gate Driver IC Inverting, Non-Inverting SOT-6
Technical Specifications
Series-
Packaging
Tube
Lifecycle StatusActive
Base Product NumberMAX690
Mounting StyleThrough Hole
Number of Voltages Monitored1
Operating Temperature0°C ~ 70°C
OutputPush-Pull, Totem Pole
Parameter ProgrammingSupported
ResetActive Low
Reset Timeout140ms Minimum
Package Type (Mfr.)8-CERDIP
TypeMulti-Voltage Supervisor
Voltage - Threshold4.65V
Package / Case8-CDIP (0.300", 7.62mm)
Customize Part Specifications , or Contact Our Sales Representative to Obtain the Data You Desireinfo@Abrmicro.com
Extended Links
Environmental & Export Classifications
RoHS ComplianceComplies with RoHS 3 Directive (2015/863/EU)
MSL Level1 (Unlimited, ≤ 30°C/85% RH), No special packaging
REACH RegulationNo SVHCs Present
Quality Inspection Records
The MAX690AMJA (IC SUPERVISOR 1 CHANNEL 8CERDIP) passed the package integrity test upon entering the Abrmicro warehouse on March 27, 2024. The tests confirmed the physical integrity of the IC package, including the leads and solderability.
Abrmicro Laboratory